Tuesday, October 9, 2007

Cute babies!


Our last adventure at the Animal House was holding these tiny monkey babies. They are a variety even smaller than the monkey that stole Alan's pen. Alan held the monkeys and I took the photos.

Sunday, October 7, 2007

Los Veranos monkey business!


After lunch, we visited the Animal House. After being sprayed with something to protect the monkeys from us, we went inside their enclosure and visited with these monkeys.

A python at lunch!


While we were waiting for lunch at Los Veranos, a man came up to our table and asked if I wanted to hold a python, actually the python he had in his hand. No, I wasn't expecting such an opportunity. About that time, Alan returned to our table and I suggested he hold the python. The handler wrapped the python on Alan's head and I took a couple of pictures. Then the handler and Alan thought I should have an opportunity. My turn with the python was cut short by our lunch being brought to our table and the python being taken away!

Sunday, September 30, 2007

Los Veranos Canopy ziplines


View

Zipping through the treetops! Over the rivers and into the trees. Better look fast or the ride will be over. The Los Veranos Canopy ziplines gave us 15 chances to do it again. I loved it-made me feel like a kid. Even did some hands-free and a backwards ride. I'll do it all over if the opportunity presents itself.

Wednesday, September 26, 2007

An oven in the kitchen!

Finally, on Sunday I got to bake a pizza in the oven and make a fresh salad. Yes, I had running water in August, but the garbage disposal wasn't hooked up to electricity until just until Alan headed back to work on the 18th. It seemed like quite a privilege to prepare a meal with an oven that heated up faster than I could prepare the pizza to go into it and a garbage disposal to dispose of produce scraps. (Our very old oven took at least 30 minutes to preheat.) Here's a picture of the oven at work and its environs. I spared you from having to look at a picture of the garbage disposal.

Both the cabinet maker and the tile craftsman are slower than promised. However, I have hope and promises that at least the tile backsplash will be completed within the next two weeks.

Tuesday, September 4, 2007

Kitchen Update, Part II




Yes, I took a photo of dishes in the sink. I was delighted finally in August when the rest of the lower cabinets were in. That meant the countertops and sinks were next. I had running water in the kitchen again and could wash dishes at the kitchen sink! I was disappointed to find out the new dishwasher would have to sit in its box in the living room until after the floor was done.


The range hood and cooktop are in place. There's no gas hooked up yet, but they look pretty and won't get very dirty if I can't use 'em!


I tried to get a good photo of the countertop. It looks much better than my photo. It's called moss, and is a green with tiny white and gold hints of color. That's why it will look good with the tiles below in the backsplash. Coming September 17th!


That's all the progress for August. But Alan came back to town (after leaving July 26) and things are getting done again. Mark Card came over this evening and put in the gas pipes working below the kitchen floor. Will I have a cooktop working before morning?

Four-year old Isaac helped his dad until he just couldn't stay awake any longer. What a good guy!





Kitchen Update, Part I


It all began months ago (May) when a cabinet door was painted a different color to see if it was the desired color. Soon, the hood was taken out and the tile was purposefully being taken off the backsplash and counters. No more tile just falling off. Alan was helping it on its way out.


There's the hood standing on end. You can see that Alan's been busy updating the intercom and moving electrical and telephone boxes so in the end all the boxes will be in just the right place.


Now this is real progress. The appliances are out of the kitchen. And, if you'll notice, the water pipes are capped off. How long will it be until we have running water in the kitchen again? And how long will we rely on the microwave and refrigerator sitting in the dining room? Also gone from the kitchen are most of the cabinets and all their contents. Lots of those items are now in the dining room and in other places around the house. Even the wallpaper has been torn from the walls and is gone. Is it time to prep and paint and walls and ceiling yet?


Yep, the first primer coat is on the walls.

Is it square? Not many angles in this kitchen are!

Masking for primer and color to go on the cabinets.



Finally, here's some color.


And, more touching up on the ceiling. After sheetrock work, texturing, sealing, primer coats, paint and lights. The ceiling will be the only part of the room finished in July.